Design/build strategies facilitated delivery of this important phase of the Roberts Bank Rail Corridor.
As part of a critical 70-kilometer rail corridor enabling international freight through the province of British Columbia, this important $110M Design-Build project brings new grade-separated structures over an active railway line in Surrey and Langley.
Geotechnical design addressed compressible soils and placement of over 20,000 MT of asphalt, while underground utilities have brought 7 kilometers of new underground duct banks and over 2,000 meters of new watermain.
Services
Geotechnical, Materials Testing, Environmental