Sotuba II 7MW Hydropower Project

extending an existing hydropower plant

The Sotuba II hydropower project aims to upgrade and extend the existing Sotuba I hydropower plant in Bamako, Mali. The new powerhouse was constructed next to the existing power plant built in the late 1960’s. Sotuba II is equipped with two 3.5 MW Kaplan bulb turbines producing 45 GWh annually.

EXP is carrying out design review and work supervision, and advises on construction progress and challenges.

 

Services

Owner’s Representation, Environmental, Civil, Geotechnical, Materials Testing + Inspection, Survey, Structural, Mechanical, Electrical, Commissioning, Construction Management, Sustainability, Water Resources

Get in touch

Interested in learning more?
Let’s work together to explore the possibilities.

Build your career

Our experience is what differentiates us.
Explore a dynamic, rewarding career with EXP.